OAK PARK TRANSITIONAL

Project notes: A 15+ year tumbled brick walkway was showing its wear. The client wished to add a new patio space for dining, but was reluctant to trash existing walkway pavers. Our solution was to flip existing tumbled brick pavers onto the fresh side, add a new 11’ x 13’ patio, and insert a contrasting tumbled clay paver banding throughout, thus creating cohesive design.